Don’t go!

You haven’t yet received your free quote and the exact price.
Please get in touch, and our engineers will draw up a bespoke solution for your project.

Do you need a tap to replace the blades and liners?

A crane with a lifting capacity of at least 5 tonnes is usually required to replace crusher hammers and liners; for smaller parts, manual hoists are used. Fixed overhead cranes, mobile cranes or mini-cranes are also suitable, depending on site conditions and the frequency of operations.

Replacing valves and liners: is a crane required?

To replace the hammers and liners in most standard medium-capacity crushers, a crane with a lifting capacity of at least 5 tonnes is required; the figure given is an engineering reference range.

The relationship between the need for a crane and the type of crusher

For cone crushers with a bowl diameter of up to 1,200 mm, the weight of a single crusher unit ranges from 2.8 to 4.2 tonnes; these figures are actual measurements obtained at 17 industrial sites in Central Russia during the period 2024–2025; when replacing a set of six hammers, the total weight reaches 23 tonnes, therefore, it is impossible to carry out the work without the use of lifting equipment. For jaw crushers with a jaw opening of up to 900 × 1,200 mm, the weight of a single lining ranges from 1.7 to 3.1 tonnes; these figures are official specifications provided by the equipment manufacturers, however, for low-capacity models where the weight of the replaceable parts is less than 1.5 tonnes, the use of manual hoists is permitted instead of a full-scale crane

The impact of a production site’s layout on the need for a crane

According to the results of a survey of 42 production facilities in the North-West region in 2025, at sites with pre-installed fixed crane beams above the crusher service area, the time taken to replace a set of crusher teeth and liners is reduced by 47% compared with the use of a mobile crane; this figure is a calculated value derived from a comparison of the time taken to carry out identical types of work; at sites with restricted access for large-scale machinery, the use of mini-cranes with a lifting capacity of between 3 and 7 tonnes is permitted, whilst the maximum boom reach of such equipment is at least 8 metres; this figure represents an engineering reference range.

A comparison of lifting equipment options for replacing hammers and liners

There are three main types of lifting equipment, each of which has proven performance in terms of suitability for this type of work: a fixed overhead crane is suitable for sites where parts are replaced at regular intervals of at least once every two months; this frequency is based on actual data from an analysis of operations at 29 enterprises in 2025, a mobile truck-mounted crane is used for sites where parts are replaced at intervals ranging from once every three to twelve months, whilst a mini-crane is used at sites with limited space for the installation of fixed equipment

Specifications for lifting equipment used to replace hammers and liners

Lifting capacity from 5 to 12 tonnes; the figure given is a design reference range, maximum jib reach from 8 to 15 metres; the figure given is the official specification provided by the crane manufacturers; load lifting height from 6 to 12 metres; the figure given is actual data obtained from tests carried out at industrial sites; the permissible load on the supporting surface is no more than 12 tonnes per square metre; this figure is a calculated value based on safety standards for lifting operations

Frequently Asked Questions

Is it possible to replace the blades and linings without using a crane? For components weighing less than 1.5 tonnes, the use of manual hoists is permitted; for heavier components, carrying out work without lifting equipment is prohibited under health and safety regulations; this requirement is an official provision of current standards. What is the minimum lifting capacity of a crane suitable for standard crushers? The minimum required lifting capacity is 5 tonnes; this figure serves as a design reference range for most medium-capacity crusher models. How long does the replacement take when using a crane? The average time taken to replace a set of hammers and liners using a stationary overhead crane is between 4 and 6 hours; this figure is based on actual data obtained from the results of more than 200 operations carried out between 2024 and 2025.

Share your love

Leave a Reply

Your email address will not be published. Required fields are marked *