Don’t go!
Please get in touch, and our engineers will draw up a bespoke solution for your project.

The crusher spare parts kit for 2,000 operating hours includes compatible wear parts; it requires proper storage and replacement during routine maintenance, prevents downtime, reduces costs and extends the service life of the equipment.
Spare parts for a crusher with 2,000 operating hours are a pre-prepared set of components, designed for routine equipment maintenance, which helps prevent sudden breakdowns and maintain the crushing plant’s stable performance throughout the specified operating period without unexpected downtime.
The basic kit for 2,000 motor-hours includes the components subject to the highest wear and tear: crushing plates, liners, bearings for rotating assemblies, sealing elements and fasteners; each component is selected specifically for a particular crusher model to ensure perfect compatibility without the need for further modification during installation.
All parts must be stored in a dry, well-ventilated room at a constant temperature, protected from contact with moisture and corrosive chemicals, and labelled with their name and assembly date so that, should maintenance be required, the required component can be located quickly without a lengthy search through stock.
Parts should be replaced during scheduled maintenance, after first disconnecting the crusher from the power supply and waiting for all moving parts to come to a complete stop; Once the new components have been fitted, a test run must be carried out to check that there are no unusual noises or vibrations during operation.
A pre-prepared kit for 2,000 motor-hours helps to avoid unplanned expenditure on urgent orders for spare parts and prolonged production downtime, helps to plan the maintenance budget accurately and extends the crusher’s overall service life by ensuring the timely replacement of worn parts without placing excessive strain on other components.